Project Scope

  • Size: 370,000 sq.ft.
    Capacity: 2,132 Students
    Budget: 157.1 M
    Completion Date: Fall 2025
    Rendering Animation
    Construction Site Aerials



  • Waco High School Topping Out Celebration


    December 14, 2023


WHS Construction Updates

  • January 16, 2024

    Posted by Jesse Botello on 1/16/2024 8:00:00 AM

    Waco High School
    Construction at Waco High School continues.
    The building is dried-in, the exterior mason on the PAC is ongoing, and all underground plumbing and all support for overhead equipment is complete.
    Click here for more photos.

    Comments (-1)
  • November 16, 2023

    Posted by Jesse Botello on 11/16/2023 5:00:00 PM

    Waco High School
    Construction of the new Waco High School continues.

    Click here for to see more photos.

    Comments (-1)
  • November 3, 2023

    Posted by Jesse Botello on 11/3/2023 8:00:00 AM

    WHS Students
    For the first time, Waco High School students met with the construction designers and used virtual reality headsets to walk down the halls of what will be the new Waco High School! Students will engage with the construction firm monthly for hands-on STEM lessons. See more photos at https://flic.kr/s/aHBqjAYdJj.

    Comments (-1)
  • September 5, 2023

    Posted by Jesse Botello on 9/5/2023 8:00:00 AM

    Waco High School
    The construction crew poured concrete and installed joists in the administration area. The Mason crew is setting blocks on the exterior walls and band hall.
    Click here to see more photos.

    Comments (-1)
  • July 25, 2023

    Posted by Jesse Botello on 7/25/2023 5:00:00 PM

    Waco High School
    The construction at Waco High School is well underway. The underground utilities public stormwater is 90% complete.
    The grade beams in section M are 100% complete.
    Drilled piers in the CTE Wing are 95% Complete and the 
    The structural steel in section P is 50% complete.
    Click here for more photos.

    Comments (-1)
  • June 26, 2023

    Posted by Jesse Botello on 6/26/2023 9:00:00 AM

    Waco High School
    Waco High School is now vertical. The auditorium slab is in process, the steel erection has started, the below slab plumbing and electrical work is completed.
    Click here for more photos.

    Comments (-1)
  • March 17, 2023

    Posted by Jesse Botello on 3/17/2023 1:00:00 PM

    The building pad preparation for the College and Technical Education (CTE) wing has begun in areas F, G, H, J, K, L, and Q.
    The Detention Pond "A" is 95% complete, and the concrete slab foundation drilled piers for areas E, M, N, and P are 98% complete.

    Comments (-1)
  • February 28, 2023

    Posted by Jesse Botello on 2/28/2023 3:00:00 PM

    Waco High Construction Site
    The foundation piers continue to be drilled on-site for the new PAC & commons area.
    The demolition of the old PAC is complete, with all remnants removed from the site & cleared away.
    The earthwork team is preparing the new building pad for the CTE athletic wing.
    Follow this link to see more photos.

    Comments (-1)
  • January 2, 2023

    Posted by Jesse Botello on 1/4/2023 3:30:00 PM

    During the winter break, work continued on the new campus. Demolition of the old Waco High Performing Arts Center has started, follow the link to see updated photos. 

    Comments (-1)
  • November 11, 2022

    Posted by Jesse Botello on 11/15/2022 9:30:00 AM

    The construction update at Waco High is as follows: Continued building pad prep for fine arts, kitchen, and common areas; continued building pad cut and prep in Admin areas and classrooms. And site utilities at New Road and Trice Avenue for new storm sewer.
    Click here for video.

     